Catégorie |
Client |
Période |
Lieux |
Geotechnique | CDE-GUINEE | 2020 | Guinée |
As part of the work’s Tri K Process Plant, on request from CDE-GUINEE company, GROUP BALING through its geotechnical Laboratory has proceeded to the study of hydraulic concrete mixt design according to the prescriptions imposed by the client.
Dreux Gorisse method